La Romaine Hydroelectric Complex Access Road

As part of the development of the approximately 1,500-megawatt (MW) Romaine Hydroelectric Complex, Norda Stelo contributed to the design of an access road connecting Highway 138 to the project’s various facilities. This approximately 150 km road corridor extends through a remote northern environment and provides access to generating stations, dams, dikes, camps and other infrastructure. The mandate included route studies, technical surveys, detailed engineering, plans and specifications, clearing studies, as well as technical assistance during construction.
Energy, Engineering,

Seymour Falls Dam Spillway Gate

Norda Stelo designed a new hydraulically actuated spillway gate for Seymour Falls Dam, whose reservoir supplies approximately one-third of Metro Vancouver's drinking water. The project aimed to improve operational safety, provide greater flexibility for annual fish migration, and integrate the new gate into the existing spillway while minimizing impacts on reservoir operations.
Energy, Engineering,

Cleveland Dam Airshaft Service Elevator and Ducting System

Metro Vancouver retained Norda Stelo as the Prime Consultant for the design and installation of a new service elevator and ducting system within an existing 60-metre-deep airshaft at Cleveland Dam. The project aimed to improve safe access to the underground galleries while protecting the equipment from the effects of a wet environment prone to icing.
Sustainable Communities, Vehicle-Grid Integration (VGI),

Vehicle Fleet Electrification Study

The mandate involves developing a transition plan toward a fully electric fleet over a five-year period. It includes an analysis of current fuel consumption, fleet size, and available electric alternatives, including cargo bikes and low-speed electric vehicles.
Energy, Vehicle-Grid Integration (VGI),

Vehicle-to-Grid (V2G) Engineering and Deployment

As Canada’s first commercial-scale Vehicle-to-Grid (V2G) deployment, this project for Fuse Power Management demonstrates how electric buses can simultaneously fulfill transportation needs while actively contributing to grid stability. Norda Stelo developed an integrated V2G solution combining charging infrastructure, utility communication systems, and intelligent energy orchestration. This approach enables vehicles to provide grid services, alleviate local constraints, and avoid major infrastructure investments.
Ports, Asset Management,

Asset Management Capacity Building

Responsible for the largest port in Eastern Canada, the Montreal Port Authority (MPA) has been consolidating its asset management approach for over a decade. This is a commendable and colossal effort, considering the scale and diversity of MPA's asset base. As a true “sherpa”, our specialized team has been accompanying MPA since 2016 in the various stages of its journey towards optimized planning of its infrastructure investments.
Industrial and Manufacturing, Bulk Material Handling,

OSB Plant Conveyor System

Design of the complete conveyor system for the entire greenfield facility.
Energy, Environment, Climate Change and Decarbonization,

Due Diligence - Biomass Cogeneration Plant

The project consisted in the due diligence of the conversion of an oil boiler to a forest biomass cogeneration plant with an organic Rankine cycle (ORC) for an autonomous network in Northern Quebec, serving an isolated community not connected to the province’s grid.