Projects - Norda
Filters
Ports, Asset Management,

Asset Management Capacity Building

Responsible for the largest port in Eastern Canada, the Montreal Port Authority (MPA) has been consolidating its asset management approach for over a decade. This is a commendable and colossal effort, considering the scale and diversity of MPA's asset base. As a true “sherpa”, our specialized team has been accompanying MPA since 2016 in the various stages of its journey towards optimized planning of its infrastructure investments.
Industrial and Manufacturing, Material Handling,

OSB Plant Conveyor System

Design of the complete conveyor system for the entire greenfield facility.
Energy, Climate Change and Decarbonization,

Due Diligence - Biomass Cogeneration Plant

The project consisted in the due diligence of the conversion of an oil boiler to a forest biomass cogeneration plant with an organic Rankine cycle (ORC) for an autonomous network in Northern Quebec, serving an isolated community not connected to the province’s grid.
Mining and Metallurgy, Engineering,

MOBLAN Project

Our team was given the mandate to complete the feasibility study (43-101) for the Moblan project of Sayona, a major lithium deposit located north of Chibougamau. It contributed to all geological, geomechanical and mining aspects of the project to issue an updated mineral resource and mineral reserve (43-101) for the project.
Mining and Metallurgy, Engineering,

WASAMAC Project

Our team was commissioned by Yamana Gold (now Agnico Eagle) to publish an updated 43-101 Mineral Resource and Mineral Reserve and to make a major contribution to the updated NI 43-101 Feasibility Study. We also carried out a comprehensive geomechanical field campaign, optimized the stopes, did the mine design, the detailed mine plan, and completed the underground engineering, including the infrastructures and services distribution.
Mining and Metallurgy, Engineering,

FENN-GIB Project

Our mining engineering experts were commissioned to carry out various geomechanical logs and data analysis, hydrogeological work planning and supervision, pit inclination angle recommendations and a detailed technical report for the Fenn-Gib project, located in Canada's main gold mining district, close to Matheson, Ontario.
Mining and Metallurgy, Engineering,

FENELON Project

Wallbridge Mining Company commissioned our team to carry out a Preliminary Economic Assessment (PEA) of the Fenelon Gold Project, located in the Nord-du-Québec administrative region, approximately 75 km northwest of the town of Matagami, and to prepare the NI 43-101 Technical Report.  The PEA was designed to assess the potential suitability of the Fenelon gold deposit for mining, processing and metallurgy, and included a design, LOM mine plan and a full economic analysis of the project. 
Mining and Metallurgy, Engineering,

CHIMO Project

Cartier Resources Inc. commissioned our team to carry out a preliminary economic assessment (PEA) for the potential re-opening of the Chimo mine, located 45 km east of Val-d'Or, and to write a NI 43-101-compliant technical report. The agreement involved the complete design of the underground mine, including service infrastructure with ore sorting facilities and a vertical conveyor system.