Projects - Norda Stelo
Filters
Industrial and Manufacturing, Optimization, Automation and Robotics,

Industrial Engineering - Digital Audit

Our client is a processor of deli meats, ham, bacon and cured meats. Today, they want to modernize the capture and visualization of their plant data and improve information links. However, the management team is wondering about the available technologies and the appropriate strategy to deploy these different projects. Norda Stelo has been commissioned to measure the Global Maturity Index (GMI). The objective of the activities carried out is to measure the global performance of the company and to propose a digital plan to achieve the company’s strategic orientations and objectives.
Energy, Engineering,

Valero's Flare

Energie Valero wanted to replace the main flare (54" diameter x 300' high). Norda Stelo was initially commissioned to determine the best of three possible scenarios, and then to carry out the detailed engineering for flare replacement during a planned shutdown of operations.
Energy, Engineering,

Detailed Engineering for Rehabilitation of Water Treatment System at Société Ivoirienne de Raffinage (SIR)

In 2014-2015, Norda Stelo was commissioned by SIR in Abidjan, Côte d'Ivoire, to carry out a detailed engineering study to propose amendments, replacements, upgrades or renovations required to ensure the proper operation of all water treatment equipment in unit 65. This unit was designed to remove insoluble hydrocarbons, and comprises various pieces of equipment, including two static longitudinal settlers (API settler), a flocculator and the dissolved air flotation (DAF) unit. The rehabilitation of unit 65 was essential in view of the construction and commissioning of a downstream biological treatment unit. This unit would enable SIR to meet future, more stringent environmental standards.
Railway, Engineering,

Engineering Services for the Gaspésie Railway Track Bridges

Norda Stelo provided engineering services for bridge inspections, bearing capacity studies and design studies, in addition to technical assistance in managing rail structures.
Railway, Engineering,

Inspection and Cleaning of the Quebec Bridge and Cost Estimate for Work

The detailed inspection program for the Québec Bridge was developed jointly by CN and Norda Stelo.
Roads, Engineering,

Construction of the New Route 112

Design and supervision of work to relocate Route 112 between Saint-Joseph-de-Coleraine and the Black Lake sector of Thetford Mines, following a major landslide at the former Lac d'amiante mine in the Chaudière-Appalaches region. An ambitious project involving the construction of a bypass road to national highway standards, with a passing lane in each direction, over 10.3 km.
Mining and Metallurgy, Optimization, Automation and Robotics,

Robotized Cleaning of Anode Butts

Norda Stelo was given the task of developing and designing an automated system for cleaning anode butts in an aluminum smelter. To achieve this, a cell equipped with two robots positioned on either side of the anode to be cleaned was created. The robots are equipped with an arm fitted with a chain flail that can loosen the deposits by mechanical action. The cell developed is suitable for restricted workspaces and allows movement and cleaning cycles adapted to the configuration of the deposits on the anode, using specific routes.
Ports, Environment, Climate Change and Decarbonization,

Montreal Port Decarbonization

Montreal Gateway Terminals Partnership (MGTP) seeks to understand and dramatically reduce its greenhouse gas (GHG) emissions. As a port terminal operator, it has many different sources of emissions from a range of different vehicle types that support the day-to-day operations of the port. This project first performed a detailed GHG inventory to identify deep GHG reduction opportunities.