Sustainable Communities, Vehicle-Grid Integration (VGI),

Vehicle Fleet Electrification Study

The mandate involves developing a transition plan toward a fully electric fleet over a five-year period. It includes an analysis of current fuel consumption, fleet size, and available electric alternatives, including cargo bikes and low-speed electric vehicles.
Energy, Vehicle-Grid Integration (VGI),

Vehicle-to-Grid (V2G) Engineering and Deployment

As Canada’s first commercial-scale Vehicle-to-Grid (V2G) deployment, this project for Fuse Power Management demonstrates how electric buses can simultaneously fulfill transportation needs while actively contributing to grid stability. Norda Stelo developed an integrated V2G solution combining charging infrastructure, utility communication systems, and intelligent energy orchestration. This approach enables vehicles to provide grid services, alleviate local constraints, and avoid major infrastructure investments.
Ports, Asset Management,

Asset Management Capacity Building

Responsible for the largest port in Eastern Canada, the Montreal Port Authority (MPA) has been consolidating its asset management approach for over a decade. This is a commendable and colossal effort, considering the scale and diversity of MPA's asset base. As a true “sherpa”, our specialized team has been accompanying MPA since 2016 in the various stages of its journey towards optimized planning of its infrastructure investments.
Industrial and Manufacturing, Bulk Material Handling,

OSB Plant Conveyor System

Design of the complete conveyor system for the entire greenfield facility.
Energy, Environment, Climate Change and Decarbonization,

Due Diligence - Biomass Cogeneration Plant

The project consisted in the due diligence of the conversion of an oil boiler to a forest biomass cogeneration plant with an organic Rankine cycle (ORC) for an autonomous network in Northern Quebec, serving an isolated community not connected to the province’s grid.
Mining and Metallurgy, Engineering,

MOBLAN Project

Our team was given the mandate to complete the feasibility study (43-101) for the Moblan project of Sayona, a major lithium deposit located north of Chibougamau. It contributed to all geological, geomechanical and mining aspects of the project to issue an updated mineral resource and mineral reserve (43-101) for the project.
Mining and Metallurgy, Engineering,

WASAMAC Project

Our team was commissioned by Yamana Gold (now Agnico Eagle) to publish an updated 43-101 Mineral Resource and Mineral Reserve and to make a major contribution to the updated NI 43-101 Feasibility Study. We also carried out a comprehensive geomechanical field campaign, optimized the stopes, did the mine design, the detailed mine plan, and completed the underground engineering, including the infrastructures and services distribution.
Mining and Metallurgy, Engineering,

FENN-GIB Project

Our mining engineering experts were commissioned to carry out various geomechanical logs and data analysis, hydrogeological work planning and supervision, pit inclination angle recommendations and a detailed technical report for the Fenn-Gib project, located in Canada's main gold mining district, close to Matheson, Ontario.