Preliminary and detailed engineering work for a new aluminum plant

Norda Stelo contributed to the construction of a new aluminum smelter with an annual capacity of 400,000 tons. Norda Stelo was also contracted to provide services in structural, electrical and mechanical engineering for the following systems:

  • crucible repair centre
  • casting centre
  • general workshops
  • pot room workshops
  • parking and refuelling facilities
  • administration buildings
  • gatehouse
  • garage

 

Norda Stelo specialists also designed and developed an operation simulator and provided the appropriate training to overhead crane operators.

  • Rio Tinto Alcan
  • Quebec, Canada
  • $2.9 B

Related projects