Prefeasibility study for a cogeneration plant on Anticosti Island
Norda Stelo conducted the technical prefeasibility study for the installation of a cogeneration plant using forest biomass on Anticosti Island. Our activities included:
- Final multi-criteria evaluation and ranking of 8 preferential opportunities
- Analysis of the Hydro-Québec program for purchasing electricity produced by cogeneration plants using forest biomass
- Supply study
- Conceptual engineering, including the definition of the process used, the equipment and manpower required, and the layout of the plant and site
- Environmental analysis (applicable legislation)
Highlights
- Capacity of 2.25 MW