Prefeasibility study for a cogeneration plant on Anticosti Island

Norda Stelo conducted the technical prefeasibility study for the installation of a cogeneration plant using forest biomass on Anticosti Island. Our activities included:

  • Final multi-criteria evaluation and ranking of 8 preferential opportunities
  • Analysis of the Hydro-Québec program for purchasing electricity produced by cogeneration plants using forest biomass
  • Supply study
  • Conceptual engineering, including the definition of the process used, the equipment and manpower required, and the layout of the plant and site
  • Environmental analysis (applicable legislation)

Highlights

  • Capacity of 2.25 MW
  • Mingan regional economic development corporation
  • Anticosti Island, Quebec, Canada