Our mining engineering experts were commissioned to carry out various geomechanical logs and data analysis, hydrogeological work planning and supervision, pit inclination angle recommendations and a detailed technical report for the Fenn-Gib project, located in Canada’s main gold mining district, close to Matheson, Ontario.

FENN-GIB Project

LOCATION
Matheson, Ontario, Canada

CLIENT
Mayfair Gold

01
Highlights
  • Geomechanical logging
  • Geomechanical data analyses
  • Litho-structural model
  • Rock Mechanics (including televiewer, lab testing, etc.)
  • Hydrogeology field work planning and supervision
  • Pit slope angle recommendations
  • Detailed technical report
02
Key expertise
  • Mining Engineering
  • Geology
Projetcs
Other projects that might interest you

Explore our portfolio of exceptional achievements, reflecting our commitment to excellence and our ability to successfully bring diverse projects to life.

Mining and Metallurgy

CHIMO Project

Cartier Resources Inc. commissioned our team to carry out a preliminary economic assessment (PEA) for the potential re-opening of the Chimo mine, located 45 km east of Val-d’Or, and to write a NI 43-101-compliant technical report. The agreement involved the complete design of the underground mine, including service infrastructure with ore sorting facilities and a vertical conveyor system.
Mining and Metallurgy

FENELON Project

Wallbridge Mining Company commissioned our team to carry out a Preliminary Economic Assessment (PEA) of the Fenelon Gold Project, located in the Nord-du-Québec administrative region, approximately 75 km northwest of the town of Matagami, and to prepare the NI 43-101 Technical Report.  The PEA was designed to assess the potential suitability of the Fenelon gold deposit for mining, processing and metallurgy, and included a design, LOM mine plan and a full economic analysis of the project.