Wallbridge Mining Company commissioned our team to carry out a Preliminary Economic Assessment (PEA) of the Fenelon Gold Project, located in the Nord-du-Québec administrative region, approximately 75 km northwest of the town of Matagami, and to prepare the NI 43-101 Technical Report. 

The PEA was designed to assess the potential suitability of the Fenelon gold deposit for mining, processing and metallurgy, and included a design, LOM mine plan and a full economic analysis of the project. 

FENELON Project

LOCATION
Eeyou Istchee, James Bay Territory, Quebec, Canada

CLIENT
Wallbridge Mining Company Limited

01
Highlights
  • Issuer of a Mineral Resources Estimates (NI 43-101).
  • Integrator and issuer of a Preliminary Economic Assessment (NI 43-101).
  • Open pit combined with complete underground mine design including service infrastructure.
  • Stope optimization with detailed mine schedule using Deswik Stope Optimizer and Scheduler.
  • Project cashflow including detailed Capex and Opex.
02
Key expertise
  • Mining Engineering
  • Geology
Projects
Other projects that might interest you

Explore our portfolio of exceptional achievements, reflecting our commitment to excellence and our ability to successfully bring diverse projects to life.

Mining and Metallurgy

CARIBOO Project

Our team updated the mineral resources and reserves, and developed a detailed mining plan using Deswik Scheduler, and provided an estimate of operating and capitalizing costs and expenses (OpEx/CapEx) for the underground mining segment. We made a major contribution to the feasibility study (43-101) with a focus on geological and mining aspects.
Mining and Metallurgy

CHIMO Project

Cartier Resources Inc. commissioned our team to carry out a preliminary economic assessment (PEA) for the potential re-opening of the Chimo mine, located 45 km east of Val-d’Or, and to write a NI 43-101-compliant technical report. The agreement involved the complete design of the underground mine, including service infrastructure with ore sorting facilities and a vertical conveyor system.