Potash Ship Loading System Expansion - Norda
Potash Ship Loading System Expansion

Potash Ship Loading System Expansion

Our team performed the detailed design of an expansion project to increase the handling capacity of an existing potash facility from six million tonnes per year to ten million tonnes per year. The project included a new 600-tonne capacity surge bin, modifications to an existing conveyor to create a shuttling head end, a new 6,000 t/h conveyor, a conveyor tunnel, and a vehicle overpass. 

Potash Ship Loading System Expansion

LOCATION
British Columbia, Canada

CLIENT
Canpotex Ltd. and Neptune Bulk Terminals (Canada) Ltd.

01
The Challenge

The expansion was constrained by the size of the existing surge bin and the existing infrastructure on site. The construction and installation of the new equipment and infrastructure took place within a limited site footprint and needed to accommodate ongoing terminal operations. 

02
Our Approach

Using state-of-the-art technology, our team designed a new “expanded flow” surge bin that doubled the bin capacity while maintaining the same height as the existing surge bin. The surge bin, with two new infeed conveyors and two new outfeed conveyors, was completely constructed beside its final position to allow the existing surge bin to continue operating during construction, then seamlessly moved into place and commissioned during a brief shutdown period. 

This project also created an alternate path for potash handling, which provided flexibility and potential for a future expansion to further increase the facility’s capacity. 

Système de chargement de navires de potasse
Projects
Other projects that might interest you

Explore our portfolio of exceptional achievements, reflecting our commitment to excellence and our ability to successfully bring diverse projects to life.

Industrial and Manufacturing

OSB Plant Conveyor System

Design of the complete conveyor system for the entire greenfield facility.
Ports

Coastal Protection Project in Cotonou, Benin

In Cotonou, the capital of Benin (West Africa), up to thirteen meters of shoreline were disappearing every year due to erosion, swallowing dozens of houses, hotels, and other buildings. In 2003, it was concluded that protective structures needed to be built along seven kilometers of coastline to safeguard the capital. The project included engineering studies and the construction of eight groynes made of concrete blocks and crushed stones over seven kilometers of coast to counter the impact of ocean waves and prevent sand erosion. The use of over 500,000 metric tons of rock, sourced from three quarries located more than 250 kilometers away from the site, along with the establishment of a concrete plant to produce the molded X-blocks, generated numerous local jobs and ensured the success of the project.